Page | 24 stipulated limits, the vessel shall not be cleared to sail until a written undertaking has been given by the vessel captain or the facility operator to arrange for the Authority to verify the outturn discharge of the vessel at port of discharge or any other means as may be directed by the Authority. (4) A facility or vessel owner who fails to comply with the outturn verification process within 60 days of a demand by the Authority shall be subject to the penalties set out in these Regulations and in addition may not be permitted to lift petroleum liquids or natural gas or its derivatives from any Nigerian facility until the Authority is satisfied that such facility or vessel owner has complied with the process. (5) A vessel which records ship/shore differences over the tolerance limit for three consecutive liftings shall not be allowed to lift cargo from any facility in Nigeria until satisfactory evidence has been provided to the Authority showing that the vessel’s measurement device has been recalibrated afterwards. CHAPTER 3 PETROLEUM MEASUREMENT 30. (1) It shall be the duty of a licensee or permit holder to whom the petroleum measurement provisions of these Regulations apply to ensure that measurement systems are installed and operated at appropriate measurement points in midstream and downstream operations; (2) Where a licensee or permit holder fails to install or operate an appropriate measurement system, the Authority shall licence a third party to install or operate a measurement system, and the licensee or permit holder who has failed to install or operate the measurement system shall be responsible for the costs incurred by the third party so licensed by the Authority. Requirement of measurement systems 31. A licensee or permit holder to whom the petroleum measurement provisions of these Regulations apply shall - (a) ensure that a person engaged in metering activities possesses the requisite qualifications and competence to perform the activities; (b) ensure that metering and allocation systems are designed, fabricated, inspected, tested, and installed in accordance with these Regulations and guidelines issued by the Authority; and Quality of metering activities
RegulationsPDF24