Page | 31 (c) Gas distribution network for distributing natural gas or derivatives to numerous customers or end-users; (d) Petroleum liquids transportation network for conveying petroleum liquids or derivatives; and (e) Gas transportation network for conveying natural gas or derivatives. (3) A pipeline or pipeline network shall not be constructed or modified without appropriate permit or licence issued by the Authority. (4) An effluent discharge, process water pipeline or any other pipeline used to support the operations of licensees undertaking midstream and downstream petroleum operations shall be registered with the Authority after securing relevant approvals in line with appropriate pipeline guidelines. 45. (1) The Authority shall not grant a licence to establish, construct, operate or renew a pipeline unless the route of the pipeline has been surveyed; or in the case of a renewal, the pipeline route has been re- surveyed. (2) The survey or re-survey of a pipeline route shall not be carried out without a valid permit to survey issued by the Authority in accordance with these Regulations or guidelines made by the Authority. (3) An application to the Authority for the grant of a permit to survey the route of a pipeline or network shall specify the approximate route of the pipeline and any proposed alternative routes. (4) An application for a permit to survey shall be accompanied with a survey programme which shall include the — (a) time, duration and place of the surveys; (b) survey methods; (c) topographical map of the proposed route of the pipeline drawn on scale – (i) 1:50,000, for a pipeline that is not more than 50 kilometres long, (ii) 1:100,000, for a pipeline that is over 50 kilometres but Permit to survey pipeline Route
RegulationsPDF31