application for revalidation does not indicate a significant change to the
conditions under which the licence to establish was earlier granted.
(2) Where the application for revalidation indicates a significant change
to the conditions under which the licence to establish was granted, all
the processes applicable to the grant of the licence to establish shall
apply to the application for revalidation.
52. (1) An application for a Permit to Construct a gas transportation
pipeline, petroleum liquids transportation pipeline, petroleum liquids
transportation network, gas transportation network or gas distribution
network shall be-
(a) made during the validity of a licence to establish;
(b) upon terms and conditions set out by the Authority in guidelines
Authority; and
(c) accompanied by a pipeline or pipeline network development
plan.
(2) the proposed pipeline or pipeline network development plan shall
show –
(a)
the selected route of the pipeline marked in red and the
sections and quarter sections. The topographical map of the
selected route shall be drawn to scale as follows:
(i) 1:50,000, for a pipeline that is not more than 50 kilometres
long,
(ii)
1:100,000, for a pipeline that is over 50 kilometres but
not more than 100 kilometres long,
(iii)
1:250,000, for a pipeline that is over 100 kilometres long,
or
(iv)
drawn on a specific scale for the purpose of
identifying clearly the proposed pipeline route;
(b)
the direction of flow of fluid or natural gas along the pipeline;
(c)
the direction of flow of fluid or natural gas along the pipeline;
(d)
the location, shown by symbols, of any installation along the
pipeline;
(e) the location of the points at which the new pipeline would cross
Application
for Permit to
Construct