Library / Page | 1 MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS REGULATIONS, 2024
Page | 1 MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS REGULATIONS, 2024
Page 90 of 101
Page | 90 FIRST SCHEDULE OFFENCES AND PENALTIES S/N OFFENCE PENALTY 1 Non-renewal of hydrocarbon processing facilities LTO NGN 2,000,000.00/ year 2 Late renewal of hydrocarbon processing facilities LTO beyond 31st of March NGN 500,000 3 Product evacuation from hydrocarbon processing facility by truck or rail without Authorisation NGN 5,000,000.00 per truck or rail wagon 4 Product evacuation from hydrocarbon processing facilities through a vessel without authorisation USD 10,000.00 5 Vessel arrival at the loading berth without Authority clearance USD 10,000.00 6 Product diversion by truck or rail NGN 5,000,000.00 per truck or rail wagon 7 Product diversion from hydrocarbon processing facility through a vessel USD 20,000.00 8 Using Authority authorised chemical/additive above or below approved quantity USD 100,000.00 9 Use of chemical unauthorised by the Authority in the hydrocarbon processing facilities USD 100,000.00 10 Operating a blending plant or waste recycling plant or waste treatment plant or bitumen processing plant or petroleum-based additives facility without licence NGN 2,000,000 11 Late renewal of blending plant LTO NGN 300,000 12 Procurement of critical equipment without Test NGN 5,000,000
RegulationsPDF90