Library / Page | 1 MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS REGULATIONS, 2024
Page | 1 MIDSTREAM AND DOWNSTREAM PETROLEUM OPERATIONS REGULATIONS, 2024
Page 91 of 101
Page | 91 13 Diversion of base oil NGN 3,000,000 per truck 14 Sale of base oil from a blending plant NGN 3,000,000 per truck 15 Construction of a blending plant/waste recycling plant/waste treatment plant/bitumen processing plant/petroleum-based additives facility without LTE NGN 1,000,000 16 Construction of a blending plant/waste recycling plant/waste treatment plant/bitumen processing plant/petroleum-based additives facility without LTC NGN 5,000,000 17 Third party blending by a plant owner without authorization NGN 3,000,000 18 Third party blending by a product owner without authorization NGN 2,000,000 19 Operating a lubricant filling plant without LTO NGN 2,000,000 per year of operation without a licence 20 Late renewal of lubricant filling plant LTO beyond 31st March of every year. NGN 100,000 21 Procurement of critical equipment without Factory Acceptance Test for lubricant filling plant NGN 5,000,000 22 Construction of a lubricant filling plant without valid LTE NGN 3,000,000 23 Construction of lubricant filling plant without valid LTC NGN 3,000,000 24 Modification of a lubricant filling plant without authorization NGN 3,000,000 25 Operation of lubricant filling Plant without valid LTO NGN 3,000,000 26 Distributors operating without lubricant storage and sales licence NGN 200,000 per year
RegulationsPDF91