Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Extraordinary Federal Republic of Nigeria Official Gazette No. 33
Page 7 of 17
B 26 By-pass of measurement system. Measurement methods. Metering System Design. Testing. Nie ait calibration and inspection of measurement system. (3) A reference temperature and pressure of 15°C and 101.325 kPa may be used for petroleum products and liquefied natural gas. 9. The by-pass of a meter bank, dispensing pump. loading gantry. ov provision for reverse flow through the meter bank ofany measurement system is prohibited. 10.—(1) The primary measurement method for determining the quantities of natural gas or its derivatives, crude oil or its derivatives. condensate, petroleum liquids. petroleum products. or any other form of petroleum liquids shall be by dynamic measurement method. (2) Notwithstanding the provisions of subregulation (1) oF this ¢ Hation, where dynamic measurement method is not applicable. static measurement method shall apply subject to conditions prescribed by the Authority, Parr 1V — DESIGN OF METERING SYSTEM AND FPS OPERATION 11.—(1) A metering system for measuring natural gas or its derivatives, erude oil or its derivatives. condensate, petroleum liquids, petroleum products orany other form of petroleum liquids shall not be designed w ithout the approval of the Authority. (2) Ameter bank shall be designed to N+1 philosophy and make provisions for proving system. (3) Anapplication for approval under subregulation (1) of this regulation shall be accompanied with — (a) the type of meter selected and selection criteria ; (>) design philosophy ; (c) fluid properties : (d¢) type of proving method ; (v) location : and (f) project cost estimate. (4) The design and location of a metering system shall be such that it is easily accessible for condition monitoring, maintenance, replacement. recertification, and repair works. 12.—(1) A licensee or permit holder shall not procure, fabricate, assemble, integrate, ship, install, modify, or commission a measurement system, sampling system, proving system, or flow computer without conducting appropriate tests, calibration, inspection and verification exercises. (2) The Authority shall witness the activities stated in subregulation (1) of this regulation. (3) The result ofa test in sub-regulation (1) of this regulation at fabrication shop or site, shall be validated to ensure the prescribed by the Authority. ‘stem meets the requirements
RegulationsPDF20232023-027