Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 107
Extraordinary Federal Republic of Nigeria Official Gazette No. 107
Page 22 of 24
B 820 SECOND SCHEDULE ADMINISTRATIVE PENALTIES The administrative penalties, referred to in ERegulation 35 of these Regulations, are — Regulations 35 No. Penalties Midstream Downstream Petroleum Petroleum Operations Operations USD NGN A— ENVIRONMENTAL PERMIT 1. | Failure to register a point source 250.00/point | 65,000/point/ source/day B — ENVIRONMENTAL STUDIES 1. | Failure to conduct requisite or statutory 100,000.00 5,000,000.00 environmental study 2. | Altering Environmental Status prior to requisite 50,000.00 5,000,000.00 Environmental Studies 3. | Commencing field data gathering without 25,000.00 2,500,000.00 approved Scope of Work 4. | Commencing construction without requisite 100,000.00 5,000,000.00 environmental study approval 5. | Failure to submit Biological Monitoring report 25,000.00 2,500,000.00 within six months of the final field data gathering C — WastTE MANAGEMENT 1. | Noncompliance with submission of Waste Release | 10,000/ month] 1,000,000/ month Inventory Consignment Notes and Manifest 2. | Unauthorised discharge or disposal of wastes 200,000.00 5,000,000.00 Use of containers not fit for purpose in waste 20,000.00 2,500,000.00 collection, storage and transportation 4. | Unauthorised storage of waste within and outside | 50,000.00 5,000,000.00 operational areas 5. | Failure to conduct Environmental Compliance 10,000.00 1,000,000.00 Monitoring 6. | Failure to submit Environmental Compliance 10,000.00 1,000,000.00 Monitoring 7. | Conduct of Environmental Compliance Monitoring | 10,000.00 1,000,000.00 without the participation of the Authority
RegulationsPDF20232023-0622