SECOND SCHEDULE 
ADMINISTRATIVE PENALTIES 
The administrative penalties, referred to in ERegulation 35 of these Regulations, are — 
Regulations 35 
No. 
Penalties 
Midstream 
Downstream 
Petroleum 
Petroleum 
Operations 
Operations 
USD 
NGN 
A— ENVIRONMENTAL PERMIT 
1. 
| Failure to register a point source 
250.00/point | 65,000/point/ 
source/day 
B — ENVIRONMENTAL STUDIES 
1. 
| Failure to conduct requisite or statutory 
100,000.00 
5,000,000.00 
environmental study 
2. 
| Altering Environmental Status prior to requisite 
50,000.00 
5,000,000.00 
Environmental Studies 
3. 
| Commencing field data gathering without 
25,000.00 
2,500,000.00 
approved Scope of Work 
4. 
| Commencing construction without requisite 
100,000.00 
5,000,000.00 
environmental study approval 
5. 
| Failure to submit Biological Monitoring report 
25,000.00 
2,500,000.00 
within six months of the final field data gathering 
C — WastTE MANAGEMENT 
1. 
| Noncompliance with submission of Waste Release | 10,000/ month] 
1,000,000/ month 
Inventory Consignment Notes and Manifest 
2. 
| Unauthorised discharge or disposal of wastes 
200,000.00 
5,000,000.00 
Use of containers not fit for purpose in waste 
20,000.00 
2,500,000.00 
collection, storage and transportation 
4. 
| Unauthorised storage of waste within and outside 
| 50,000.00 
5,000,000.00 
operational areas 
5. 
| Failure to conduct Environmental Compliance 
10,000.00 
1,000,000.00 
Monitoring 
6. 
| Failure to submit Environmental Compliance 
10,000.00 
1,000,000.00 
Monitoring 
7. 
| Conduct of Environmental Compliance Monitoring | 10,000.00 
1,000,000.00 
without the participation of the Authority