SECOND SCHEDULE 
B 105 
[Regulation 46 (1), (2)(d) and (3)] 
OFFENCES AND 
PENALTIES 
authorization. 
S/N 
OFFENCE 
PENALTIES 
I. 
| Non-renewal of hydrocarbon processing facilities LTO. 
NGN 2,000,000.00/year 
2. 
{Late renewal of hydrocarbon processing facilities LTO 
| NGN 500,000 
beyond 31st of March. 
3. 
| Product evacuation from hydrocarbon processing facility 
| NGN 5,000,000.00 per truck 
by truck or rail without Authorisation 
or rail wagon 
4. 
| Product evacuation from hydrocarbon processing facilities 
| USD 10,000.00 
through a vessel without authorisation. 
5. 
| Vessel arrival 
at the loading berth without Authority 
| USD 10,000.00 
clearance 
6. 
| Product diversion by truck or rail 
NGN 5,000,000.00 per truck 
or rail wagon 
7. 
| Product diversion from hydrocarbon processing facility 
| USD 20,000.00 
through 
a vessel. 
8 
| Using Authority authorised chemical/additive above or 
| USD 100,000.00 
below approved quantity. 
9. 
| Use of chemical unauthorised by the Authority 
in the 
| USD 100,000.00 
hydrocarbon processing facilities. 
10. 
| Operating a blending plant or waste recycling plant or waste 
| NGN2,000,000 
treatment plant or bitumen processing plant or petroleum- 
‘ ased additives facility without licence. 
11. 
| Late renewal of blending plant LTO. 
NGN 300,000 
12. 
| Procurement of critical equipment without Test. 
NGN 5,000,000 
13. 
| Diversion of base oil. 
NGN 3,000,000 per truck 
I4. 
| Sale of base oil froma blending plant. 
NGN 3,000,000 per truck 
15. 
| Construction of a blending plant/waste recycling plant/ 
| NGN 1.000.000 
Waste treatment plant/bitumen processing plant/petroleum- 
based additives facility without LTE. 
16. 
| Construction of a blending plant/waste recycling plant/ 
| NGN5,000,000 
waste treatment plant/bitumen processing plant/petroleum- 
based additives facility without LTC. 
17. 
| Third party blending by a plant owner without authorization. 
NGN 3,000,000 
18. 
| Third party blending by 
a product owner without 
NGN 2,060,000