Library / Extraordinary Federal Republic of Nigeria Official Gazette No. 107
Extraordinary Federal Republic of Nigeria Official Gazette No. 107
Page 12 of 24
B
810
Mystery
spills
Spill or
release
reporting,
investigation
and clean-up
Liability and
documen-
tation of
spills
Remediation
and
restoration
of impacted
area
(2) There shall be an annual drill exercise scheduled by the Authority
for the activation of the SRCP of a licensee or permit holder.
27.
A licensee or permit holder shall contain and recover any spill
discovered within its operational area whether or not its source is known and
even while the joint investigation process is yet to be concluded.
28.—{1) A spill or release of refined and unrefined petroleum, natural
gas, industry chemicals, and products shall be reported to the Authority within
24 hours of the spill or release, in accordance with the Spill or Release
Notification Reporting format and procedures as prescribed in the guidelines
issued by the Authority.
(2) A Joint Spill Investigation (JSD team, comprising of the licensee or
permit holder, the spiller where different from the licensee or permit holder,
the community where applicable, the Authority and other relevant stakeholders,
shall be convened by the licensee or permit holder of the affected facility,
within 24 hours of the spill or release notification to conduct a Joint Investigation
Visit (JIV).
(3) A licensee or permit holder responsible for a spill or release shall be
required to conduct a PIA study of any adversely impacted environment within
a specific timeframe as prescribed in the guidelines issued by the Authority.
(4) An approval by the Authority shall be required for any remediation
and rehabilitation method to be used for clean-up and restoration of an
impacted site.
29.—(1) Aspiller shall be liable for the damage and cost incurred from
a spill clean-up or remediation by a licensee or permit holder who is not the
spiller.
(2) Where more than one spiller is responsible and liable, the liability
shall be joint and several.
(3) Alicensee or permit holder shall keep a register of potentially polluted
spill site or past impacted spill site and the site shall be cleaned-up or remediated
in accordance with guidelines issued by the Authority.
(4) A licensee or permit holder shall provide
a geochemical
characterisation or fingerprint of petroleum liquids, such as crude oil and
condensate, being transported, processed, or stored at its facilities.
30.—_(1) A
licensee or permit holder shall obtain the approval of the
Authority prior to commencement of any remediation project.
(2) A licensee, permit holder or spiller liable for any spill or release shall be
responsible for the clean-up and restoration of any impacted area to its original
state.
RegulationsPDF20232023-0612