Domestic Reneries Performance 
(February 2026)
(
78.13%
AGO Supply Performance
Shut down. However, evacuation 
of AGO produced while the 
renery was operational averaged 
0.392 million litres/day.
Shut down
Average Capacity Utilization:
Average domestic supply
February 2026
PMS Supply Performance
Average domestic supply
36.5 million litres/day
8.2 million litres/day
B.
t (February 2026)
Operation Status
Average domestic supply
Shut down. However, 
closure of renery,
AGO averaged at 0.027 ML/D 
was tucked out to the 
domestic market.
UPDATE ON KEY PROJECTS:
Introduction of hydrocarbons at WalterSmith refinery 
is still ongoing.