Afrindustria/ Gas Gap Monitor

Library / NMDPRA Fact Sheet- March 2026

NMDPRA Fact Sheet- March 2026

Page 8 of 11

Open the PDF at page 8

7
7.  Indicative Fuel Prices Average
D.  GAS PROCESSING CAPACITY 
Facilities design capacity vs Utilization rate (%) 
Design capacity: 3.500 Bscf/day 
Design capacity: 1.250 Bscf/day 
Design capacity: 0.680 Bscf/day 
Design capacity: 0.554 Bscf/day 
Design capacity: 0.600 Bscf/day 
Utilization: 62.97%
Utilization: 97.56%
Utilization: 48.39%
Utililization: 87.20%
OB/OB AG Gas plant:
Util: 23.10%
    Design capacity: 1.300 Bscf/day
Utililization: 104.62%
Utorogu NAG1&2 Plant 
 Design capacity: 0.510 Bscf/day
Utililization: 40.32%
t (March 2026)
S/NO DESCRIPTION
LAGOS
ABUJA
KANO
CALABAR
SOKOTO
MAIDUGURI
IBADAN
ENUGU
1
INDICATIVE PUMP PRICE (N/L)
@Average NFEM FX Rate of 
N1,377.61/USD
1,249.01
  
1,286.81
     
1,298.11
   
1,252.67
         
1,303.52
   
1,317.19
            
1,257.07
     
1,280.43
           
2
MAXIMUM ACTUAL PUMP PRICE 
(N/L) 
1,208.00
 
1,238.00
     
1,273.00
  
1,250.00
        
1,305.00
   
1,300.00
          
1,238.00
    
1,368.00
          
3
MINIMUM ACTUAL PUMP PRICE 
(N/L) 
1,073.00
  
1,166.00
     
1,118.00
   
1,154.00
         
1,148.00
   
1,177.00
           
1,146.00
     
1,172.00
           
4
AVERAGE ACTUAL PUMP PRICE 
(N/L) 
1,140.50
  
1,202.00
     
1,195.50
   
1,202.00
        
1,226.50
   
1,238.50
          
1,192.00
     
1,270.00
           
 PRICE FOR THE PERIOD  - 1ST - 31ST MARCH 2026
CRUDE OIL PRICE (Dated Brent): $103.89/bbl; GASOLINE COST: $1,046.52/MT
PMS PRICE: