D.  GAS PROCESSING CAPACITY 
Major Gas Facilities, Installed Capacities & Average Utilization Rates
Design capacity: 3.500 Bscf/day 
Design capacity: 1.250 Bscf/day 
Design capacity: 0.680 Bscf/day 
Design capacity: 0.554 Bscf/day 
Design capacity: 0.600 Bscf/day 
Utilization: 79.28%
Utilization: 101.96%
Utilization: 52.75%
Utililization: 89.20%
OB/OB AG Gas plant:
Util: 22.94%
    Design capacity: 1.300 Bscf/day
Utililization: 107.64%
(as of April 2026)
Utorogu NAG1&2 Plant 
 Design capacity: 0.510 Bscf/day
Utililization: 38.01%